US181 Harbor Bridge Project Corpus Christi

Replacement of the existing Harbor Bridge and reconstruction of portions of US 181

  • Texas, USA
  • Pre-cast segmental
  • En curso (Finalización prevista: 2024)

Highlights

  • Deck surface 20.000 sqm.

Description

The project involves the development, design, construction, and maintenance of a totalof 6.44 miles of bridge and connecting roads. Rizzani de Eccher USA supplied 1 launching gantry and provided technical assistance.

Empresas involucradas

Rizzani de Eccher USA Deal

El grupo

Contratista general

Contratista especializado

Otras actividades