Hathaway Bridge Replacement
US181 Harbor Bridge Project Corpus Christi
Replacement of the existing Harbor Bridge and reconstruction of portions of US 181
- Texas, USA
- Pre-cast segmental
- En curso (Finalización prevista: 2024)
Highlights
- Deck surface 20.000 sqm.
Description
The project involves the development, design, construction, and maintenance of a totalof 6.44 miles of bridge and connecting roads. Rizzani de Eccher USA supplied 1 launching gantry and provided technical assistance.